1 of 1
Kitchen Day 5
Boiler is being drained
Kitchen as the rewiring is being done
Outlet on left side is being converted from a double to a quad
The studs run vertical
Wine cooler corner before conversion
Wine cooler corner
Re-piped wine cooler corner
Wiring and piping going well
Wasp next from inside wall
There is a little of the wasp nest left (center of picture)
Master water valve
Water pump controls
At days end its basically done but a mess
Stuff everwhere
Oct 31, 2008